ahhhhhhhh3833 ahhhhhhhh3833
  • 07-06-2023
  • Mathematics
contestada

A mean project duration has been computed to be 42 weeks with a standard deviation of 2.5 weeks. Determine the probability of the project duration i) not more than 36 weeks, 45 weeks and 49 weeks. ii) being between 37 and 47 weeks (4)

Respuesta :

Otras preguntas

What is the answer to 15=k+8.2
What is the answer to 15=k+8.2
A man spent exactly $2.50 on 3¢, 6¢, and 10¢ stamps. If he bought ten 3¢ stamps and twice as many 6¢ stamps as 10¢ stamps, how many 10¢ stamps did he buy?
What is a harmful effect of electrical resistance?
Explain when each method(graphing, substitution,linear combinations) is a good method to find a solution to a system of equations.
which of the expressions doe not contain any like terms?    a. 2x2+3x-4x+2     b. xy+yz-17     c. x2+x2-2x-x2   d. 4+8+y
A religion that starts with L
How did washingtons policy on matters at home differ from his foreign policy
Mr. Prince takes his wife and two children to the circus. If the price of a child’s ticket is 1/2 the price of an adult ticket and Mr. Prince pays a total of $1
Mr. Prince takes his wife and two children to the circus. If the price of a child’s ticket is 1/2 the price of an adult ticket and Mr. Prince pays a total of $1