mary6985 mary6985
  • 10-01-2024
  • Business
contestada

At one factory, if the hourly demand is 80 units, a container holds 12 units, lead time is 75 minutes, and safety factor is 5%, how many production cards are needed?

a. 8
b. 9
c. 525
d. 526

Respuesta :

Otras preguntas

Class B { Public: Void b1(); Protected: Void b2(); }; Class A : public B { Public: Void a1(); Protected: Void a2(); }; Class C: public A
Once you've posted, there's no ________ Digital citizenship is about integrity, __________, and responsibility
Read the description: Student Voice is a magazine that provides information about different clubs in schools, award winning novels, and cool experiments that ca
What are true of multicellular organisms
What is the value of g(f(x)) f(x)=2x^2+3 g(x)=x-4
y=1/3x+5 through (2,1)
how many cubic meters of gravel are in the back of a full dump truck that measures 7m wide by 4m tall by 16m long​
If i have 30 Apples I Give 12 to My Friend And She Gives 7 to Her Grandma How Much Would I Have?
How does climate change impact the Forests of Sumatra?
What does Macro and Micro mean ?