AbbypiePink7441 AbbypiePink7441
  • 07-03-2024
  • Physics
contestada

Find the amount of work required to pull a dangling chain of length 5 meters and a mass density of 4 kg/m up over the side of a tall building (of height at least 5 m).
a) Work = 0 J
b) Work = 100 J
c) Work = 200 J
d) Work = 500 J

Respuesta :

Otras preguntas

If |z1| = 2 , |z2| = 3 , |z3|=4 and |2z1 + 3z2 + 4z3| = 5 what is the value |8z2z3 + 27z1z3 + 64z1z2 | ??? help me please​
Reread the following passage from pages 69-70: "The discipline wand, in the hand of the Childcare worker, whistled as it came down across Asher's hands. Asher w
Which of the following expressions is equivalent to 14xy – 28x – 36y + 48?
26. Six oranges in a bag of 30 oranges are bad. Express the number of bad oranges as a fraction in its lowest terms. ​
Write any four characteristics of Human Resource Management.? ​
. Solve for x in the equation log (7x+5) -log(x - 1) = 1(with full working​
What would happen if a state had seceded from America?
Beginning in the 1400s, the catholic clergy made large contributions to the scientific knowledge of Europe. True or false?
Help!!!!! I can’t fail this! How did Muhammad change arabic religion?
Solve systems of equations by elimination -9x-2y=5 -9x-2y=11