carriedixon8326 carriedixon8326
  • 08-04-2024
  • Social Studies
contestada

Which of the following are assumptions that justify the costs of quality?

1. failures occur
2. prevention is cheaper
3. performance can be measured

Respuesta :

Otras preguntas

What is the slope of the line graphed on the coordinate plane?
Which were religious forces in Asia?
To eliminate the x-terms and solve for y in the fewest steps, by which constants should the equations be multiplied?
Which of the following pairs interacts with one another in a competitive manner? A. a bird and the snake that preys on the bird’s eggs. B. a bird and the mite t
Determine the exponential function that satisfies the given conditions: The initial mass is 1.4g and it is halving every 4 days.
What is the ordered pair for the relation y=x^2 if x=5
Plz help I’m so stressed A number is written with the following factorization: 2 to the second power times 3 times 5 to the 4th power times 8 times 11 to the s
Are the ozark and ouachita mountains located east or west of the Mississippi river
why was the american revolution also consudered a civil war?help plz
Which statement is true? A) Geothermal power plants use the renewable resource of heat from within the Earth to generate electricity. B) Hydroelectric energy us