christianjames21 christianjames21
  • 10-12-2019
  • Mathematics
contestada

Drew and Tim work at a recycling plant. Drew can sort a batch of recyclables in 2 hours alone while Tim can do it in 3 for the same job: if they work together how long will it take them to sort?

Respuesta :

sharonwitten95 sharonwitten95
  • 10-12-2019

Answer:

2.5 hours if they help each other

Answer Link

Otras preguntas

How could the loss of biodiversity affect humans?
Which object is a system made up of subsystems A. Mineral B. Rock C. Earth D. Box
What are the gases that come to equilibrium between the upper layer of the ocean and the atmosphere?
if 1 gallon of paint covers 400 sq feet, about how many gallons of paint are needed to paint the outside of a spherical tank of diameter 20 feet?
Enzymes are proteins that speed up reactions by
What does w = PleaE help
In China in the 1980s, commune-based agriculture was replaced by the _______ responsibility system.
what is a tribulatory
how to say "will you be my girlfriend" in Spanish
Facebook's initial IPO was $38 per share. Arianna purchased 616 shares. Assuming a cost of $7.00 to purchase the 616 shares, what was Arianna's total cost?