LO 4.1Burnham Industries incurs these costs for the month:



What is the prime cost?

Respuesta :

Dryomys Dryomys
  • 09-01-2020

Answer:

$5,000

Explanation:

Given that,

Direct material cost = $2,000

Direct labor cost = $3,000

Prime cost is the sum total of direct material and direct labor cost.

Prime cost:

= Direct material cost + Direct labor cost

= $2,000 + $3,000

= $5,000

Therefore, the prime cost is $5,000.

Note:

Table is missing from the question so I have attached the table.

Ver imagen Dryomys
Answer Link

Otras preguntas

What do all organisms need? Check all that apply. multiple cells air blood water food a place to live
A 200 g sample of water with a temperature of 32◦C is added to 50 g water at 55◦C in an insulated container. What is the final temperature after thermal equilib
find the zeros of the polynomial f(x) = 4 root 3x^2 +5x -2root3 and verify the relationship between zeroes and coefficients
A circle of yellow tulips is planted in Cedarburg's central park. Pam measured the circle and calculated that is has a circumference of 12.56 yards. What is the
[tex]64 {x}^{2}- 25y^{2} [/tex]Factor.​
choose the best translation for the next sentence The pictures are taken by the photographer. Las fotos son sacadas por un fotógrafo. Las fotos eran sacas por
What is sqrt 25x^2y^2/sqrt xy in simplest form?
By whom is chemistry used in the real world
What is the theme of the book Wild Bird
Which object has the greatest gravitational attraction ?