When a contractor is under a contractual duty to construct a building and the building is destroyed by an act of nature while it is still a work in progress, the destruction __________.

Respuesta :

imustapha180
imustapha180 imustapha180
  • 08-02-2020

Answer: the destruction will not discharge the contractor's duty to perform, but will extend the date of performance

Answer Link

Otras preguntas

The stipulation requiring that accused persons be told they have "the right to remain silent" stems from A. Marbury v. Arizona. B. Miranda v. Arizona. C. the Mo
Which leader's attitudes at the end of World War I are described below? He believed that Germany should be punished for the War, but in a way that would lead to
TRUE OR FALSE ALL PRIME NUMBERS ARE ODD
ENIAC was the first instance of what?
Misty has 84 photos from her vacation and 48 photos from class outing, she want to put all the photos in a album with 4 photos on each page how many pages does
There are 8 pencils in a package. How many packages will be needed for 28 children if each child gets 4 pencils?
Alex can type 72 words per minute.How many words can Alex type in 5 minutes?
Whats 8 divided by 1,976?
10 times as much as 0.2 is
If angle 1 and 2 are complementary angles and Angle 2 is 20° more than Angle 1, what are the measures of each angle?