ani36880 ani36880
  • 06-03-2020
  • Mathematics
contestada

Mr. Young has a section of his parking lot, measuring 10 yards by 12 yards, that needs to be replaced. The paving company told Me. Young the workers complete 3 and 1/5 square yards every 1/4 hour. How long should it take to pave the parking lot?

Respuesta :

jerrysmith0517
jerrysmith0517 jerrysmith0517
  • 06-03-2020

Answer:

36.9230769231

Step-by-step explanation:

10*12

ans/3.25

Answer Link

Otras preguntas

Which statement provides the most logical explanation of why union workers who had been blacklisted following the Pullman Strike found it almost impossible to f
141000000 in scientific notation
if an animal cell shrinks it was probably placed in a
a stars mass determines ?
The purchasing power of people with _____ decreases a lot when inflation occurs. rising incomes fixed incomes
Which of these is a common feature for the lac and trp operon? Regulatory proteins bind to operator Regulatory proteins bind to promoter Regulatory proteins bin
Did the Comanche invent anything?
what is āˆ’9sāˆ’8 5s=āˆ’10
Which is an arrangement of genes consisting of an operator, a promoter, and a repressor?
How does tripling the side lengths of a right triangle affect its area?)