brionesgonzalo8291 brionesgonzalo8291
  • 07-04-2020
  • Business
contestada

A difference between the static budget and the flexible budget is called the ________. a. total variance. b. volume variance. c. flexible budget variance.

Respuesta :

Lanuel
Lanuel Lanuel
  • 11-04-2020

Answer:

b. volume variance.

Explanation:

Volume variance can be defined as the difference between the static budget and the flexible budget.

It mainly occurs as a result of the difference between the actual volume and the budgeted volume derived from the static budget.

Answer Link

Otras preguntas

water aids digestion. true or false.
why haven't europeans used maritime routes before age of exploration
"We were hiking along a winding trail." Which word in the sentence functions as an adjective?
the locus of points equidistant from sides ad and cdneed help have no idea what this means.
the ratio of legs to ears on dogs is 4:2 if there were 20 legs how many ears would there be
Name the enzyme that breaks down H2O2.. Anybody know?!?!?!?!
what is the simple predicate in she and her classmates practice their english
How to solve the equation 3x - 2y = 6 for y in terms of x
Select the proper inverse operation to check the answer to 14 + 17 = 31. A. 31 ÷ 17 = 14 B. 31 − 17 = 14 C. 14 − 17 = 31 D. 31 × 14 = 17
according to john locke, why do people choose to live under governmental rules?