adilynnmireles adilynnmireles
  • 07-05-2020
  • Mathematics
contestada

4. A ramp is being constructed with wood and then filled with concrete. How many cubic feet of concrete will be needed to complete the ramp?

Respuesta :

Jaymonster17
Jaymonster17 Jaymonster17
  • 16-05-2020

Answer:2.5

Step-by-step explanation:

Answer Link

Otras preguntas

What roles do the additional leachate management and gas collection systems play at Fresh Kills?
Which organism is a primary consumer in this ecosystem?A - CaterpillarB - WeaselC - GrassD - Fox(Apex)​
A wave hits the beach about every 2.0 seconds on a calm day. If it crests are 5.00 meters away from each other, what is the speed of the wave
Given the following balanced chemical reaction, what volume of 3.0M H2SO4 is required to neutralize 60.0 mL of 0.5M NaOH? Be sure to include the formula and sho
the excerpt the most dangerous game what does word zealous mean
If you have employees you’ll have to pay the ____ tax which is used to pay compensation to workers who lose their jobs A) EIN B) FUTA C) SSI D) workers’ comp
Need help on these four and then I am done, please help, I'm slowly getting the hang of it, I've already done all the other ones!
How did the threat of invasion lead to the development of the manor system
What is he best definition of technology
In this excerpt from his first address to Parliament, in what two ways does Winston Churchill arouse patriotic feelings in his audience? We shall not flag nor f