julieisnor1985 julieisnor1985
  • 10-09-2020
  • Engineering
contestada

What different tests did the team perform to come up with a workable design?

Respuesta :

fabiolagonzalez729
fabiolagonzalez729 fabiolagonzalez729
  • 10-09-2020
They ran different shapes and materials through a wind tunnel to see which shape and material would decrease energy output so that it takes in equal COthan it puts out.
Answer Link

Otras preguntas

Why we use semiconductor instead of metal in thermopile.
Simplify 2m^2 – 2m + 3m^2
A group of hikers is descending a mountain at a rate of 400 feet per hour. After three hours, what integer represents their total change in elevation? I am not
if chaka,ada and ese are to share 120 oranges with the ratio of 1:2:3 respectively. How many oranges does ada have?.​
One meter is about 39.36 inches. How many inches are in 100 meters?
Common mistakes in determining organizational goals, causes and solutions
(a − 1/a)^2 − (a + 1/a)^2 = (A) 4 (B) -4 (C) 2 (D) -2 (E) 2a
find a number such that when 3/4 of it is added to 3.5 the sum is the same as when 2/3 of it is subtracted from 6.5​
My mother allows me to go out with you. → I……………………………………….
find the 11th termm of the arithmetic sequence with first term 3 and common difference -2