jjaelayahtwin5371 jjaelayahtwin5371
  • 10-09-2020
  • Mathematics
contestada

Newman is building a patio. He estimates that he can install 8 square feet of paver bricks every quarter-hour. How many square feet does Newman install per hour?

Respuesta :

adefunkeadewole adefunkeadewole
  • 11-09-2020

Answer:

32 square feet

Step-by-step explanation:

From the above question, we know that: for Newman:

8 ft² = 1/4hour

x ft² = 1 hour

We Cross Multiply

8ft² × 1 hour= x ft² × 1/4hour

xft² = 8ft² × 1 hour/1/4 hours

x ft² = 32 ft²

Therefore, Newman installs 32 square feet per hour

Answer Link

Otras preguntas

Assess barry gross, the founder and president of billcutterz.com? how has gross performed as the president of the company as it progressed from new venture into
The numbers 2.888... and 2.999... are both rational and irrational. What is an irrational number that is between the two rational numbers? Pls answer asap!
How would I write the inequality for number 7 ? Don't solve !! Please and thanks for your help
Jose now has $500. how much would he have after 6 years if he leaves it invested at 6.7% with annual compounding?
A system will always require what power connector?
How many moles of aluminum do 3.90×1024 aluminum atoms represent?
what is the answer to : 7(5n-8)+6(4+6n)
Why had the spanish been comparatively lucky in their colonizing mission to the americas? mesoamerica's sedentary populations were already familiar with social
Who started his graduate career running baby chickens through mazes in william james’ basement?
Because particular places and times have their own personality or emotional essence (such as the stark feel of a desert or the formality of the victorian times)