tastyqueen tastyqueen
  • 08-12-2020
  • Chemistry
contestada

A 800N mountain climber scales a 160m cliff. How much work is done by the mountain climber?

Respuesta :

Muscardinus Muscardinus
  • 12-12-2020

Answer:

Work done, W = 128 kJ

Explanation:

Given that,

Weight of a mountain climber, F = 800 N

It climbs to a cliff that is 160 m high.

We need to find the work done by the mountain climber. The work done by an object is given by the formula as follows :

W = Fd

Put the values of F and d.

W = 800 N × 160 m

W = 128000 J

or

W = 128 kJ

So, 128 kJ of work is done by the mountain climber.

Answer Link

Otras preguntas

in the equation x^2+10x+24=(x+a)(x+b), b is an integer. find algebaically all possible values of b
Mrs. Waterston wants a fence in area for her dog. She has 72 feet of fencing and wants to use all of it to enclose a space with the greatest possible area. Whic
Cancer is caused when healthy cells begin to mutate and grow uncontrollably.
Which of the following is NOT an example of reproductive isolation? A. differences in courtship song between two populations of meadowlarks B.difference in th
What's an example of figurative language in the poem: Arithmetic by Carl Sandburg?
Solve photo question. Mathematics. Please.
the _ tells you which operation to perform first so that everyone finds the same value for an expression
the lines 2x-y=8 and 4x -2y=16 intersect at???
Which two geographical features helped protect Egypt from invaders? desert and a seacoast with no harbor desert and mountains mountains and a seacoast with no h
What country did not occupy germany following ww2