maddieshea maddieshea
  • 08-02-2021
  • Mathematics
contestada

POSSIBLE POINTS: 33.33
Tyler can complete his Algebra Il project in 2.5 hours, but if he works with Luke they can finish in 1.5 hours. How long would it take Luke to finish the
project on his own?

Respuesta :

drewhaynes018 drewhaynes018
  • 08-02-2021
All you need to do is find what the average of them two would be. Its 3 hours
Answer Link

Otras preguntas

Why do plants have a slow transport system?
What is a bird that is usually blue in color? It is three letters long.
what is the supreme law of the land
Find the derivative of the function. y=sqrt( 3x+sqrt( 3x+sqrt( 3x))) Plz help :)
You have to use the numbers 1,2,3,4 and 5. Add those numbers and the sum should be equal to 50. You can combine the numbers to form tens (i.e 2 and 4 is 24) but
_______ was the first person to propose the idea of moving continents as a scientific hypothesis.
what mAkes television more populer than radio and cinema?
Examples of Idioms in true grit
What is the purpose of the biogeochemical cycles?
Heather finished a race in 58.4 seconds, which was 2.6 seconds less than her practice time. Write and solve an equation to find Heather's practice time. Show th