omolayobeuty82 omolayobeuty82
  • 08-03-2021
  • Mathematics
contestada

A flower is constructed by 44 workers in 99 days.if 121 workers are employed to do the job.how many days will it take to complete the construction.​

Respuesta :

sqdancefan
sqdancefan sqdancefan
  • 08-03-2021

9514 1404 393

Answer:

  36

Step-by-step explanation:

We assume that time is inversely proportional to the number of workers. So increasing the number of workers by a factor of 121/99 = 11/9 will decrease the number of days by a factor of 9/11.

  (9/11)(44 days) = 36 days

It will take 36 days to complete the construction with 121 workers.

Answer Link

Otras preguntas

read each aloud as you write the equivalent measures. A. 2.7km= ___________km______m B.3.46l= __________l_________ml C.5005kg=________kg_________g D. 8ml= _____
a rectangular plot of land has a perimeter of 680 feet. the land is 60 feet longer than it is wide. find the length and width of the land. ( with matrices if yo
please put these fractions in order from least to greatest  11/15, 3/5, 2/3, 19/30
My math is due tomorrow been out sick please help me answer my questions tonight please and thank you 84 is 60% of what number find 39% of 65 what number is 53%
What is 194753 decreased by two thousand
how do you express the area of a triangle as a monomial?
how to divide 36 into 540 using partial quotients
which is not a compound? a)Gold b)water c)sugar D)silicon dioxide
the original location of an earthquake is also known as
Juanita has a strip of paper divided into 8 equal sections. She colored 3 of the sections yellow, 2 of the sections black, and the rest are green. What fraction