8 man takes 15 days to cut a drain. How many men should be employed to complete the
work?​

Respuesta :

llbedoya
llbedoya llbedoya
  • 09-06-2021

Answer: 8 x 15 = 120

Answer Link

Otras preguntas

Which is a subfield of the other? geometry or mathematics (Language Arts IXL)
what is 5 8/12 as a mixed number in simplest form​
PLEASE HELP! Will give brailiest to the best answer!!!What was a contributing factor to the growth of ranching during the Republic of Texas era?F. the wild catt
FOR 20 POINTS! GIVE REAL ANSWERS PLEASE. THANKS! Davon's solution to the equation -2(x - 5) + 3 = -4 is shown below. -2(x - 5) + 3 = -4 Step 1 -2x - 5 + 3= -4
In 1469 Ferdinand of Castile and Isabella of Aragon married and united the two territories. Please select the best answer from the choices provided T F
A swim club has two payment plans. You can become a member by paying a $12 new member fee and use the pool for $3 a visit. Or, you can use the pool as a nonmemb
Read the excerpt from 1 Kings 5. And Hiram gave Solomon cedar wood and cypress wood (according to) all his desire. And Solomon gave Hiram twenty thousand measu
How can we create equations in two variables to represent relationships between quantities
Use the drawing tool(s) to form the correct answer on the provided graph. Graph the inverse of the line provided on the graph. ​
On the map above, the Anatolian Peninsula is located at __________. A. Number 1 B. Number 2 C. Number 3 D. Number 4