kofistitt kofistitt
  • 09-10-2017
  • Mathematics
contestada

If 6 men can do a piece of work in 14 days, how many men are needed to do the work in 21 days?

Respuesta :

Stochastic
Stochastic Stochastic
  • 09-10-2017
Nine men are needed.
hope this helps
Answer Link
SchoolNerd1947
SchoolNerd1947 SchoolNerd1947
  • 09-10-2017
The answer should be 9 workers due to 7 day periods.

21/7 =3
3+6 =9

Answer:9
Answer Link

Otras preguntas

a tube of lipstick cost $12.50 plus 7% tax what will you pay at the checkout will mark brainiest show ur work ty so much
Which operation led to the allied forces breaking through the Gothic Line? A. Operation Barbarossa B. Operation Olive C. Operation Torch D. Operation Overlord
Solve for x, and please explain! Thanks in advance :D
Which of the following methods is used to destroy all living spores? Question 18 options: Decontamination Bactericidal Sterilization Disinfection Which of the
When Vlad moved to his new home a few years ago, there was a young oak tree in his backyard. He measured it once a year and found that it grew by 26 centimeters
The two major ways a person can become a legal U.S. citizen are (3 points) jus soli or jus sanguinis birth or naturalization application or an oath education or
The weather forecaster says that there is a 49% chance of rain today. Which statement describes the likelihood that it will rain today? A) It is neither likely
the spoke of wheel reaches from the center of the wheel to its rim. If the circumference of the wheel is 42 inches, how long is each spoke? Use 3.14 for pi, an
And this one :/ I need to find what m<1=
What action removes carbon dioxide from the body