daltonjohnson92 daltonjohnson92
  • 09-12-2017
  • Mathematics
contestada

A bill from a plumber was $306 The plumber charged $150 for parts and $52 per hour for labor. How long did ths plumber work at his job?

Respuesta :

shawnkat
shawnkat shawnkat
  • 09-12-2017
We can make an equation from this.
Our intial value is 150 for parts, and he works for 52 dollars an hour.
We can define h for hours and c for total cost.
Therefore, we have:
c = 150 + 52h.
We can set this equal to 306 dollars, as that's the given total cost:
306 = 150 + 52h
Subtract 150 from both sides:
52h = 156
Divide both sides by 2:
h = 3
He worked 3 hours.
hope this helped!

Answer Link

Otras preguntas

How does ralph overcome jacks challenge during the discussion about what to do about the beast?
every page on a website must be updated recently to consider the website updated/maintained
What is the answer nto this qustion
Sikhism began as a movement to combine _____.
What is 32.15 in expanded fraction
find th value of m 4 ( m - 2) =24
For security, a credit card number is coded in the following way, so that it can be sent as a message. Subtract each digit from 9. (8) Code the credit card numb
What tragic connection did many of the leaders share?
The addition of a catalyst to a chemical reaction provides an alternate pathway that
A student measured the mass of a small object and found it to be 56.0 grams. the object's mass is known to be 55.0 grams. what is the percent of error in the st